Refurbishing a Rental Property Between Tenancies: A Landlord's Guide for London

Refurbishing a Rental Property Between Tenancies: A Landlord's Guide for London

Most refurbishment advice is written for owner-occupiers, but landlords face a different set of pressures entirely. There is no six-month runway to think things through, no living with the mess while decisions get made room by room. There is a void period, usually a matter of weeks, and a property that needs to be safe, compliant and lettable again as quickly as possible without throwing money at work that will not improve the rent or the tenant pool. Getting that balance right between tenancies is one of the more specialised jobs in refurbishment, and it rewards planning just as much as any larger renovation does.


Why the void period is the right time to refurbish

A void is the only point in a tenancy when a landlord has genuinely free access to every room, without working around someone's daily life or giving notice for each visit. Anything involving noise, dust, or taking a kitchen or bathroom out of use is far easier and cheaper to do now than to negotiate later with a sitting tenant. It is also the moment to catch problems tenants rarely report promptly, such as slow extractor fans, worn sealant, or flooring that has moved slightly out of level. Treating the void as routine maintenance rather than a proper inspection point is how small issues get carried forward, tenancy after tenancy, until they become expensive.


Deciding how much work is actually worth doing

Not every void justifies a full refurbishment, and not every void should be limited to a lick of paint either. The right scope depends on the property's position in the market, how long the current finish has left in it, and what similar lettable properties nearby are offering. A flat with the same kitchen and bathroom since it was first let ten years ago is a different proposition to one refurbished eighteen months ago that just needs decorating and a deep clean. Landlords who refurbish reactively, doing only what a departing tenant's complaints forced them to notice, tend to spend more over time than those who plan a light-touch refresh every tenancy and a fuller refurbishment on a longer cycle.


The compliance checks you cannot skip

Whatever else is or is not done to the property, a void period is also when the statutory and safety obligations get renewed. These are not optional extras to fit in if time allows; they are the checks that determine whether the property can legally be re-let.

Refurbishing a Rental Property Between Tenancies: A Landlord's Guide for London image 2
  • Smoke alarms on every storey and a carbon monoxide alarm in any room with a solid fuel appliance, tested and working
  • A valid gas safety certificate before any gas appliance is used by a new tenant
  • An in-date Electrical Installation Condition Report, with any remedial work closed off
  • A current Energy Performance Certificate, renewed if it has expired or if works have changed the property's rating
  • Fire doors and self-closers in place and functioning correctly in any house in multiple occupation

Building these checks into the refurbishment programme, rather than treating them as a separate administrative task, avoids the common scenario where the works finish on time but the property still cannot legally be let because a certificate has not been arranged.


Structural and layout changes between tenancies

Occasionally a void is the trigger for something more substantial than redecoration: opening up a poky kitchen, converting an underused third bedroom, or reconfiguring a layout that has never worked well for tenants. These changes can genuinely improve the achievable rent and the speed of re-letting, but they need realistic timescales attached. Structural work, Building Regulations sign-off, and any Party Wall Act notices where relevant do not compress just because rental income is sitting idle. A landlord considering structural change is usually better served accepting a longer void once, with a clear brief and a fixed programme, than squeezing major building work into the same two-to-three week window used for a cosmetic refresh.


Budgeting and cost planning for a turnaround refurbishment

Cost planning for a void refurbishment works differently to a homeowner's renovation because the return is measured against rent, not against enjoyment of the property. It is worth pricing works against the achievable rent uplift and the reduction in void time a better-presented property tends to bring, rather than against what an owner-occupier would spend. Durable, easily maintained materials generally outperform higher-end finishes in a rental context, since they need to survive multiple tenancies with minimal intervention. A sensible contingency, in the region of ten to fifteen per cent, is still worth holding back even on a modest refresh, since older rental stock often reveals issues once flooring or old kitchen units are lifted.


Working to a tight programme

Refurbishing a Rental Property Between Tenancies: A Landlord's Guide for London image 3

Every day a property sits empty is a day of lost rent, which makes the construction programme itself part of the financial case for the works. A realistic programme, agreed before work starts rather than estimated on-site, should account for lead times on ordered items, the sequence of trades, and a fixed date for final cleaning and photography ahead of re-marketing. Landlords managing several properties often find it pays to have a shortlist of contractors used to this pace of work, rather than re-tendering from scratch for every void, since familiarity with the property and the landlord's standards saves time on every turnaround.


Choosing a contractor who understands landlord timescales

Not every contractor is well suited to void period work. It requires a different mindset to a homeowner's project: faster decision-making, less scope for changing minds mid-project, and comfort coordinating compliance certificates alongside the physical works. When comparing quotations for this kind of job, it is worth asking directly how a contractor plans to sequence the work to minimise the void, and whether they can coordinate gas, electrical and EPC certification as part of the programme rather than leaving the landlord to chase these separately once building work has finished.


Common mistakes landlords make with void period work

  • Waiting until a tenant has already left before ordering long-lead items such as kitchen units or flooring, extending the void unnecessarily
  • Refurbishing reactively around complaints rather than planning a consistent standard across the portfolio
  • Treating compliance certificates as an afterthought rather than building them into the works programme
  • Over-specifying finishes that do not survive repeated tenancies and need replacing again within a few years
  • Underestimating what a genuinely thorough clean and presentation does for both achievable rent and speed of re-letting

Getting the balance right

The best void period refurbishments look unremarkable: a property that re-lets quickly, at a fair market rent, with nothing outstanding on the compliance side and nothing that will resurface as a complaint three months into the new tenancy. That outcome is rarely accidental. It comes from treating the void as a planned piece of work with its own programme and budget, rather than a scramble to get the property back on the market, and from working with people who understand that a landlord's priorities are not quite the same as an owner-occupier's.

Bayocorp works with homeowners, landlords and property professionals across London and the South East, providing refurbishment, cost planning, project management and construction delivery.

Renovate | Refit | Refurbish